Municipal Engineering

市政工程

Jingcheng Expressway Phase III Project

  • Author: Administrator
  • Date: 2016-12-30 08:26:01
  • CTR: 1643

Jingcheng Expressway Phase III Project

- Geotechnical investigation, engineering surveying, foundations detection

The total length of 63.994km, Hebei Province is the first true meaning of the mountain expressway, a total of eight interchange along the bridge, 108, 20 tunnels.